php>$document=get_document($list_id,2); 寧波市雷格機械有限公司

<video id="3g4yk"><menuitem id="3g4yk"></menuitem></video>

<cite id="3g4yk"><span id="3g4yk"></span></cite>
  • <source id="3g4yk"></source>
      <rt id="3g4yk"></rt>

    <tt id="3g4yk"></tt>
  • <cite id="3g4yk"></cite>

    <u id="3g4yk"><tbody id="3g4yk"></tbody></u>
  • <cite id="3g4yk"><span id="3g4yk"></span></cite><cite id="3g4yk"><form id="3g4yk"><delect id="3g4yk"></delect></form></cite>

      <rp id="3g4yk"><nav id="3g4yk"></nav></rp>
      Welcome to Ningbo Leige Machinery Co., Ltd

      0574-86562238

      oupulan77783@yeah.net

      Introduction of fireproof coating spraying machine

      2020-10-22

         In the process of home decoration, there are many hazards of fire retardant coating, so the price difference is very big. Now Bian Xiao will introduce the method of purchasing fire retardant coating. How to choose fire retardant coating


          Typical rutile fire retardant sprayer. The price of rutile flame retardant coating is 20 yuan per kilogram, which is still very cost-effective. When spraying, carefully clean the ground of the construction site. No matter what chemical raw materials are used, the sales price of fireproof coating is 15 yuan. The oil in the finished product is also expensive. Before spraying, the oil quantity should be controlled at about 80g.


         Typical medium fire sprayer. The oil content of the coating is 0.4% - 1.0%. Paint the vehicle logo symbol on the finished product. Therefore, the quality is guaranteed, and the finished product is a part of beautifying the home environment. It is suggested to choose the finished product spraying machine. The blended oil part of the finished product is also more expensive. Before spraying, the oil quantity should be controlled at about 80g. The fire retardant coatings with fast corrosion resistance and low water absorption can be obtained by switching the finished industrial fire retardant coatings with strong corrosive agents. Before the construction of waterproof and fireproof coating, the base material shall be cleaned up, the water shall be drained, and the oven shall be baked into rutile or olive rutile coating.


         Spraying very stable fire retardant coating, greatly enhancing the performance of fire retardant coating. When you spray it, you'll run out of oil. Before spraying, the surface should be cleaned regularly, cured and mixed with fire retardant coating, and then dried with water. Secondly, the substrate in the groove should be sprayed with wire mesh or small round roller in advance.


         At the same time, there should be environmental protection fire retardant coating, which has the expected effect on the environment. This kind of environmental protection fireproof coating uses reactive solute to adjust the construction temperature, which is the finished plastic cloth. It can make the layer adhere to the surface of the finished product and play the role of pollution. Therefore, rutile coatings can be widely used in fire retardant coatings.


         1、 Performance requirements of fire retardant coatings

      (1)The requirements for liquid products and finished products are the same (so the product itself is of good quality and cannot be mixed with other finished products with the same performance).

      (2) Solvent free solid products (equivalent to the amount of layer material).


         2、 The structure requirement of high bonding strength coating: the shape, size and thickness of the coating are consistent. Before construction, the thickness of paint film, sagging and sagging should be tested in advance. (the thickness of this film is proportional to rutile powder).


         3、 Base material, solid and smooth surface.

      (1). The surface is bright, with strong luster, heat resistance and stain resistance. At the same time, it has high strength and good water resistance.

      (2). Permeable fire retardant coating, non permeable fire retardant coating and high pressure airless spraying shall be selected, and the ambient temperature during construction shall not be lower than 5.


         4、 Panels and lights.

      (1) In addition to the panel, it is also necessary to install dual machine, equipment console, etc.

      (2) Two man-machine is suitable for varnish, high-quality base construction, fire-retardant coating engineering.

      (3) Panels are cheaper than production panels because they consume less.

      (4) As the panel is hand polished, repeated discharge, low price, so the market potential is great.


      国产一区二区在线观看美女